Building Updates:
- Interior framing is completed. (Picture of the stage with partial back wall)
- Shingles and lap siding is installed while concrete stone siding is going up this week. (Picture included)
- Windows are installed, and doors should be installed in a few weeks.
- Rough electrical and plumbing is very near completed.
- Stairs to the basement have been installed. (Picture included)
Next Up:
- Exterior Doors
- Gutters
- Insulation
- HVAC
- Drywall
- Parking Lot (Picture of dirt leveling for it)